Installation & Operation Manual
884
Document # LTRT-92224
Mediant 8000
c.
Wait up to 10 minutes until the ES board in slot 9 completes the restart
operation and returns to service. Use the following command to determine
whether the ES board has completed the restart operation. Value Enabled(1)
indicates that the board is back in service:
SC-1 -- ~ -- /moGW
•
show esboard#9 param OperationalState
OperationalState=Enabled(1)
d.
Unlock the ES board in slot 19:
SC-1 -- ~ -- /moGW
•
unlock esboard#19
Performing unlock action on /moGW/moSwitchBoard#19 - OK!
e.
Wait up to 10 minutes until the ES board in slot 19 completes the restart and
returns to service. Use the following command to determine whether the ES
board has completed the restart operation. Value Enabled(1) indicates that
the board is back to service:
SC-1 -- ~ -- /moGW
•
show esboard#19 param OperationalState
OperationalState=Enabled(1)
10.
Connect network cables to port 20 on both ES boards (located in slots 9 and 19).
Summary of Contents for Mediant 8000
Page 2: ......
Page 33: ...Part I Hardware Overview This part describes the hardware overview of the Mediant 8000 chassis...
Page 34: ......
Page 90: ......
Page 158: ......
Page 264: ......
Page 546: ......
Page 775: ...Part VI Maintenance This part describes the Mediant 8000 maintenance procedures...
Page 776: ......
Page 834: ......
Page 879: ...Part VIII Appendices This part describes additional Mediant 8000 configuration procedures...
Page 880: ......
Page 924: ...Media Gateway Mediant 8000 www audiocodes com Installation Operation Maintenance Manual...