RM500SL
®
User's Guide Version 3.4
June 2011
the on-ear reference microphone, interfering with the sound-field equalization. For this
reason, the hearing instrument must be muted during sound-field equalization.
1. Position the client and probe tube and enter audiometric data. See On-Ear Measures -
Setup, Speechmap ®, Speechmap Fitting Procedures.
2. Highlight and <PICK> Instrument and select Open from the list.
3. Highlight and <PICK> Test 1 - 4. If this is the first Open test in a session, you will be
prompted to mute or turn off the hearing instrument and select the Equalize button on
the setup poster. Otherwise, you are reminded to equalize whenever the client or nearby
objects are moved. After equalization, unmute or turn the instrument on and follow the
fitting procedures in Fitting to targets for soft speech to Fitting to targets for mid-level
speech.
Verifying Frequency Compression/ Frequency-
Lowering Hearing Instruments in Speechmap
Frequency lowering is used when it is not possible to amplify the high frequency
components of speech sufficiently to raise them above threshold. In this case, the high
frequency components may be shifted to a lower frequency with a better hearing threshold
where the available gain will render them audible.
Four modified versions of the Speech-std (1) test stimulus (Speech3150, Speech4000,
Speech 5000 and Speech6300) are provided in Speechmap to assist in verifying and
adjusting frequency lowering devices. In each of these modified test stimuli, the 1/3 octave
band levels above 1000Hz are reduced by 30dB, except for an isolated 1/3 octave band
centered at the frequency indicated in the selected test stimulus’ name. With these reduced
band levels, the resulting LTASS produces a distinct “cavity” between 1000Hz and the
selected high frequency band, as seen below for the FM Boom test signal. For clarity, the
Speech3150 curve is not shown.
85
Summary of Contents for RM500SL
Page 1: ...RM500SL User s Guide Version 3 4 March 2010...
Page 9: ...RM500SL User s Guide Version 3 4 June 2011 EC Declaration of Conformity 9...
Page 10: ...RM500SL User s Guide Version 3 4 June 2011 10...
Page 37: ...RM500SL User s Guide Version 3 4 June 2011 37...
Page 43: ...RM500SL User s Guide Version 3 4 June 2011 telecoil test 43...
Page 51: ...RM500SL User s Guide Version 3 4 June 2011 51...
Page 57: ...RM500SL User s Guide Version 3 4 June 2011 57...
Page 64: ...RM500SL User s Guide Version 3 4 June 2011 64...
Page 78: ...RM500SL User s Guide Version 3 4 June 2011 Screen tour unaided screen 78...
Page 97: ...RM500SL User s Guide Version 3 4 June 2011 97...
Page 98: ...RM500SL User s Guide Version 3 4 June 2011 98...
Page 99: ...RM500SL User s Guide Version 3 4 June 2011 99...
Page 102: ...RM500SL User s Guide Version 3 4 June 2011 102...
Page 112: ...RM500SL User s Guide Version 3 4 June 2011 112...
Page 113: ...RM500SL User s Guide Version 3 4 June 2011 113...