4-4. MECHANICAL ADJUSTMENT
58
1). CHECKING OF THE LOCATION FOR EACH ASSEMBLING PART
Check the following before the disassembly, replacement and assembly of the Deck.
a. Check the assembling standard of the Deck Mechanism at the EJECT Mode.
b. Before and after assembling the L/C Bracket Total Ass’y, check the assembling location for the Cam Switch, the
F/L Sub Rack and the Cam Gear.
(Refer to the Picture 4-1)
c. Check the assembling location of the R Loading Ass’y and L Loading Ass’y to assemble Loading Gear Bracket
Ass’y. (Refer to the Picture 4-2)
PICTURE 4-1 The Assembling standard for the L/C Bracket Total Ass’y
PICTURE 4-2 The Assembling standard of the R and L Loading Ass’y
Summary of Contents for AVP-7180
Page 16: ...3 2 CIRCUIT DIAGRAMS 15 1 CONNECTION DIAGRAM...
Page 17: ...16 2 POWER CIRCUIT DIAGRAM...
Page 19: ...18 3 SERVO SYSCON CIRCUIT DIAGRAM...
Page 21: ...20 4 VIDEO NOR AUDIO CIRCUIT DIAGRAM...
Page 23: ...22 5 Hi Fi PRE AMP CIRCUIT DIAGRAM...
Page 24: ...23 6 A V IN OUT CIRCUIT DIAGRAM...
Page 42: ...41 3 TIMING CHART OF S1 MECHA MECHANISM...
Page 46: ...45 B Deck bottom view...
Page 50: ...SKETCH OF JIGS AND TOOLS 49...
Page 70: ...4 6 EXPLODED VIEW OF DECK AREA AND PARTS LIST 69 1 EXPLODING VIEW OF THE DECK...
Page 71: ...70...
Page 74: ...AUDIOVOX SPECIALTY MARKETS CO LP 23319 COOPER DR ELKHART IN 46514 219 266 1886...