GB13
Introduction
Before you start using your Auping
Royal bed or if you have dismantled it
to clean or move it, you have to fit and
install the AirMassage & Hotspot again
in full or in part.
In this chapter you can read how to set
up the complete system.
Use the installation card and/or
template included.
7.1 Description
A. Transformer
B. Control box
C. Connectors
D. Remote control
7.2 Safety
The AirMassage & Hotspot conform to
current CE directives.
A schematic connection diagram can
be found on the underside of the
control box.
Use the AirMassage & Hotspot only in
combination with an Auping Royal
mesh base.
Check that the connecting voltage of
the transformer corresponds with that
of the mains voltage in your home.
7.3 Fitting the parts
You need to remove the mattress
cover only if you want to wash or dry-
clean it. The mattress has a removable
comfort layer that contains the Hotspot
and AirMassage. This layer can only be
removed by a qualified craftsperson.
7. Installation guide
fig. 4
Euro, UK or USA plug
3866_bw.qxp:63510_Auping_Royal_hot 28-11-2008 11:37 Pagina GB13
Summary of Contents for AirMassage & Hotspot
Page 24: ...NL 22 3866_bw qxp 63510_Auping_Royal_hot 28 11 2008 11 37 Pagina NL 22...
Page 66: ...FR22 3866_bw qxp 63510_Auping_Royal_hot 28 11 2008 11 37 Pagina FR22...
Page 88: ...D22 3866_bw qxp 63510_Auping_Royal_hot 28 11 2008 11 37 Pagina D22...
Page 122: ......
Page 150: ...ES22 3866_bw qxp 63510_Auping_Royal_hot 28 11 2008 11 38 Pagina ES22...