6
3. Handlebar Installation .
Remove Four Flat top Bolt M8X15(9)and Four
Washer
Ф8xФ16x1.5 (10) from the Handlebar (3).
Connect the Hand Pulse Wires (35) from the
Handlebar (3) to the Computer Extension Wire (13)
from the Handlebar Post (2). Attach the Handlebar
(3) onto the Handlebar Post (2) with Four Flat top
Bolt M8x15(9)and Four Washer
Ф8xФ16x1.5 (10)
that were removed.
4. Handlebar post cover A Installation .
. Attach the Handlebar post cover A (12) onto the
Handlebar Post (2) with Four Screw ST2.9×
16
(11).
5 .Meter Installation
Remove four Bolt M5x10 (15) from the Meter (8)
Connect the Hand Pulse Sensor Wires (14)and
Extension Sensor Wire
I
(13) to the wires that
come from the Computer (8).
Tuck wires into the Handlebar Post (2).
Attach the Meter (8) onto the Handlebar Post
(2)with four Bolt M5x10 (15) that were removed.