Step 10) Install Cooking Grid:
(Note Warming Rack already installed.)
Lay Cooking Grid onto the Bowl ridges over the
Flame Diffuser and Main Burner. (FIG. 10)
11
Step 8) Attach Front Panels:
Place Lower Metal Panel behind the
front legs with short side to the right.
Secure the 2-bottom screws. (FIG. 8A)
Attach Top Fabric Panel to the top of
the legs. Position the eyelets over the
bolt and nut on each side to align to
align all attachment holes . (FIG. 8B)
Secure Fabric Panel to holes in the legs
over the eyelets. Over lap bottom of
Fabric Panel to Metal Panel, then secure
with screws through both panels to the
remaining holes in legs.
(39) COOKING GRID
1 PC
FIG. 8A
FIG. 10
(39) COOKING GRID
Step 9) Install Flame Diffuser:
Place the Flame Diffuser over the Main Bowl
Burner, onto the two mounting studs on each
side of the Bowl. (FIG. 9)
(38) FLAME DIFFUSER
Flame Diffuser mounting stud in Bowl.
(38) Flame Diffuser
FIG. 9
(37) FABRIC PANEL
(36) FRONT METAL PANEL
1 PC
(21) SCREW, ST4.0 x 10
(21) SCREW, ST4.0 x 10
8 PC
Eyelet fits over
Bolt and Nut
FIG. 8B
RIGHT SIDE