Menu
►
Operation set
►
Max chrg cur
►
30.0A(Current value setting)
Menu
►
Etc. set
►
sch chrg run
►
21:00
Menu
►
Etc. set
►
sch Dchrg stop
►
06:00
• Set charging time and amount of charge
Menu
►
Calibration set
►
Max chrg cur
►
30%(Discharge amount setting “%”)
Menu
►
Etc. set
►
sch chrg run
►
08:00
Menu
►
Etc. set
►
sch Dchrg stop
►
18:00
•
Grid-connected type
- Charging time : Charge the battery using the grid and PV power.
- Discharging time : Discharges to the grid using battery and PV power.
◐
Stop
•
Press the KEYPAD <ENTER (SET)> key to stop the inverter.
•
Turn OFF the load side circuit breaker and AC circuit breaker. If the grid power is cut off, the system will go
into the standby state without charging or discharging the system. If the AC circuit breaker is not turned OFF,
it will automatically restart after the automatic switching time elapses.
•
Turn off the DC input circuit breaker for PV input and turn off the battery input breaker. The charged voltage
inside the inverter gradually discharges. Since it takes about 10 minutes to completely discharge the battery,
check whether the voltage charged in the condenser is fully discharged for the purpose of internal inspection.
◐
When a system error occurs, the <FAULT> LED will be lit and you can check the information via the LCD
screen.