8
Solar PV Module
4.
Mounting
Each module must be securely fastened at a minimum of four (4) points on two (2) opposite sides. The
following clamping positions should be adhered to:
PV modules can be mounted to a substructure by clamping at the front side of the module frame or by
screwing at the back side of the frame.
The tightening torque must be 8-10 Nm.
Do not drill any additional holes into the module.
Use appropriate corrosion-proof fastening materials.
WARNING! Product warranty may be void in cases where above clamping positions, improper
clamps or unsuitable installation methods are found.
Clamping positions when clamping
on the long sides
MA series
220 – 340mm
MB-series
220 – 340mm
MC(E)-series
220 – 340mm
MD(E)-series
340 – 550mm
PC(E)-series
220 – 340mm
PD(E)-series
340 – 550mm
Clamping positions when clamping
on the short sides
MA series
150 – 200mm
MB-series
200 – 250mm
MC(E)-series
200 – 250mm
MD(E)-series
200 – 250mm
PC(E)-series
200 – 250mm
PD(E)-series
200 – 250mm