en/TA-11-ALM-6040/10040FL
pag.: 20
USER /
INSTALATION
MANUAL
4-POST HD
ISSUED 26-05-04
A L M - 6 0 4 0 F L
A L M - 1 0 0 4 0 F L
AUTEC Hefbruggen bv
Industrieterrein IJsselveld, Vlasakker 11, 3417 XT MONTFOORT, The Netherlands
Tel: +31 348 477000 Fax: +31 348 475104 Internet: www.autec.nl - E-mail: info@autec.nl
7.
INSTALLATION
7 . 1
P r e p a r i n g t h e a s s e m b l i n g a r e a .
The lift must be placed on an even, compact, resistant floor. If the floor does not meet these requirements,
construct 4 concrete bases
(fig. 3)
which must be cast at least a week before assembling the lift.
(N.B. Concrete should be R'bk 250 dass or higher with suitable reinforcement).
fig. 12
Cement base measures
Maximum capacity on every post
Cement base measures