9-9
FITTED EQUIPMENT
prevent filling.
Check that all the gas and/or electricity
supplies are turned on.
Gas operation.
Operate the left-hand switch
to the on (flame) position. There will be a pre-
purge pause of approx. 5 seconds to allow
any un-burnt gas to leave the flue. A green
LED will light upon successful flame ignition.
If there is air in the gas supply line it may
take a few attempts for the gas to ignite. See
later section for gas lockout re-setting. If the
ignition is not satisfactory the red LED will
flash, refer to the trouble shooting guide.
Electric operation.
The water heater is
equipped with twin 600W / 230 V ac
immersion heater elements offering operation
at 600W or 1200W. Operate the right-hand
rocker switch to the top position (
) to turn
on one electric element. To turn on both
electric elements, operate the right-hand
rocker switch to the bottom position (
).
Note:
The electric elements will still operate if
the appliance is in gas ignition lock-out.
Gas and electric operation.
For faster
heating the appliance can be operated with
both gas and electric.
Switching off.
Operate the left-hand gas
switch to the top Off position (
)
and
the
right-hand electric rocker switch to the centre
position (
). If the heater is not going to be
used for some time, isolate the gas supply
and drain water if there is a risk of freezing.
Please Note:
The water may drip from the
discharge pipe of the pressure-relief valve
during heating up. This pipe must be left
open to the atmosphere, must be installed in
a continuously downward direction and in a
frost free environment. The pressure relief
valve must be operated regularly by turning
the red knob in the anti clock wise direction,
to remove lime deposits and to verify that it is
not blocked.
Summary of Contents for Peugeot Kemerton
Page 2: ...DATA RECORD ...
Page 10: ...2 4 MOTORHOME CODE ...
Page 16: ...5 2 ARRIVAL AT SITE ...
Page 24: ...6 8 SAFETY SECURITY ...
Page 42: ...7 18 CONNECTION OF SERVICES 12V 230V WIRING DIAGRAM ...
Page 69: ...9 23 FITTED EQUIPMENT 1 2 4 3 5 6 ...
Page 70: ...9 24 FITTED EQUIPMENT 7 8 10 9 11 12 ...
Page 75: ...9 29 FITTED EQUIPMENT ARRANGEMENT OF EQUIPMENT ...
Page 79: ...9 33 FITTED EQUIPMENT NORMAL SEATING ASSEMBLY ...
Page 80: ...9 34 FITTED EQUIPMENT DOUBLE BED ASSEMBLY ...
Page 106: ...13 2 NOTES Designed and Printed by Preset Graphics Tel 01332 549278 MY 2011 Ref 21210 ...