5
In the Electrical tool palettes set, click the Tag and Schedule palette.
6
Click a panel schedule tool.
NOTE
Alternatively, you can select a panel in the drawing, and click Panel tab
➤
Circuits panel
➤
Panel
Schedule
.
7
In the Panel Schedule dialog, for Panel, specify the panel for which you want to create the
schedule.
The panels available in the drop-down list are assigned to the electrical project database.
8
Select a panel schedule table style.
9
For Show panels from, select Electrical project database, and click OK.
10
Repeat the previous steps as necessary to create additional panel schedules for the same sheet.
To generate a panel schedule in the current drawing, you can use the Panel Schedule tool on the Electrical
tool palette. You can also create a panel schedule using the Circuit Manager.
About Panel Schedules | 457
Summary of Contents for 235B1-05A761-1301 - AutoCAD MEP 2010
Page 1: ...AutoCAD MEP 2010 User s Guide March 2009 ...
Page 22: ...4 ...
Page 86: ...68 ...
Page 146: ...128 ...
Page 180: ...162 ...
Page 242: ...Modifying the elevation of a duct 224 Chapter 6 Drawing HVAC Systems ...
Page 264: ...246 ...
Page 480: ...462 ...
Page 534: ...516 ...
Page 616: ...598 ...
Page 658: ...640 ...
Page 788: ...770 ...
Page 802: ...784 ...
Page 820: ...802 ...
Page 878: ...860 ...