34-10-00 7-1 CLEANING: PITOT STATIC SYSTEM
LNE
GENERAL, REFERENCES AND REQUIREMENTS
Task may only be performed by an organization or individual trained and entitled to do 'Line Maintenance'!
Secure gyroplane against unauthorized or unintended operation!
SPECIAL TOOLS AND CONSUMABLE MATERIALS
PRECAUTIONS AND SAFETY MEASURES
CAUTION: Make sure all pitot and static lines are disconnected from any instruments before blowing
through the lines!
CAUTION: Do not blow with the mouth directly into pitot or static ports. This will introduce moisture and
may damage instruments!
PROCEDURES
1
Disconnect all instruments from pitot and static lines. These are altimeter, airspeed, but also VSI and
integrated display systems, if installed.
NOTE: In most cases it is not necessary to remove the instrument panel.
2
With the help of compressed air clean all pitot and static lines by blowing from the inside (cockpit panel side)
to the outside.
3
Make sure to clean/check each branch of a line by closing the other open ends.
4
Re-connect all instruments and perform Pitot Static System Integrity Test, see
Summary of Contents for MTOsport
Page 1: ...Manufacturer Maintenance Manual Line Maintenance ...
Page 2: ......
Page 88: ......
Page 90: ......
Page 96: ......
Page 98: ......
Page 100: ......
Page 110: ......
Page 112: ......
Page 116: ......
Page 134: ......
Page 138: ......
Page 164: ......
Page 166: ......
Page 170: ......
Page 172: ......
Page 176: ......
Page 178: ......
Page 180: ......
Page 184: ......
Page 190: ......