6.1 - INITIAL LIGHTING
Preliminary checks
The first ignition must be carried out by a
qualified technician. Failure to do so could
cause injury to persons, animals or damage
to property. Automatic Heating shall not be
held liable for any injury and/or damage
.
Before firing the boiler check that:
-
the boiler installation has been carried out in accordance
with the specific Standards and regulations in force relating
to the gas part and to the electrical part;
-
the air supply and the discharge of the products of
combustion are carried out in the correct way in accordance
to the specific Standards and regulations in force;
-
the boiler is fitted with all the safety and control devices
prescribed by the regulations in force;
-
the electrical supply must be 230 V - 50 Hz;
-
the C.H. system has been filled with water;
-
any gate valves of the CH system are open;
-
the gas for the back-up boiler corresponds to the one which
the boiler has been calibrated for: otherwise convert the
boiler to use the available gas; this operation must be carried
out by a qualified technician in compliance to the regulations
in force;
-
the gas supply cock for the back-up boiler, if present, is
open;
-
there are no gas leaks;
-
the external mains supply switch is on;
-
the system’s safety valve on the boiler is not blocked and
that it is connected to the sewage system;
-
there are no water leaks;
-
all the necessary ventilation conditions and minimum
clearance distances are guaranteed for subsequent
servicing.
LIGHTING AND SHUTTING DOWN PROCEDURES
For lighting and shutting down the boiler refer to the “USER
INSTRUCTIONS MANUAL”
Information to be passed on to the user:
The user must be instructed on the use and operation of the
boiler and the hearing system, in particular:
-
Hand the user the : “USERS INSTRUCTION MANUAL”, as
well as all the other literature relative to the appliance, and
placed in the envelope contained in the packaging.
The
user must keep this literature for any future reference.
-
Inform the user of the importance of the air vents and of
the flue outlet system, stressing the fact that absolutely
no modification can be made.
-
Inform the user about controlling the system water
pressure and how to restore it to the correct value.
-
Explain and demonstrate to the user the correct function
and adjustment of the temperature, thermostats and
radiators for the economic use of the system.
-
Remind the user that a comprehensive service and the
measurement of the combustion efficiency should be
carried out regularly (as requested by the regulations in
force).
-
If the appliance is sold or transferred to another owner or
if the present user moves home and leaves the appliance
installed, ensure yourself that the manual always follows
the appliance so that it can be consulted by the new
owner and/or installer.
BOILER START-UP
6
Gasogen
Summary of Contents for Gasogen
Page 1: ...Wood Fired Boiler Gasogen 29 93kW Installation and Servicing Manual ...
Page 66: ...Gasogen notes ...
Page 67: ...notes ...