10
4. M
AINTENANCE
D
ETAILS
WARNING!
Failure to maintain equipment may result in injury or death and/or damage to property and equipment
Recommended maintenance to be performed on the operator and gate are as follows:-
Operator performs over 150 cycles a day
each month
Operator performs between 100-150 cycles a day
every 2 month
Operator performs between 50-99 cycles a day
every 4 months
Operator performs between 20-49 cycles a day
every 6 months
Operator performs under 20 cycles a day
every 12 months
Date: ..............................................................................................
Site Name:..........................................................................................................................................................
Site Address: ......................................................................................................................................................
Before commencing maintenance on the operator, isolate the electrical supply to ensure operator will
not run inadvertently.
Gate hinges in good condition and oiled/greased ....................................................
Gate swings freely .............................................................................................................
Gate stops in good condition...............................................................................................
Gate operator mounting bolts tight .....................................................................................
All arm joints loose but firm...............................................................................................
No oil leaks from gearboxes ...............................................................................................
Gearbox drive cogs tight on shafts......................................................................................
Gearbox mounting bolts/nuts tight......................................................................................
Inside operator and control box clean .................................................................................
‘Baygon’ Surface Spray around op
erator and control box (not on electronics)..................
Torque limiter chain slightly oiled......................................................................................
All electrical connections tight ...........................................................................................
Limit Switches operate in appropriate positions (if applicable) .........................................
External safety devices work effectively ............................................................................
External locks operate correctly..........................................................................................
General operation i.e. speed, auto close etc normal............................................................
Arm taper lock grub screws tight ............................................................................
Comments ..........................................................................................................................................................
...........................................................................................................................................................................
Service performed by.........................................................................................................................................