SL 90X-91X
Technical Manual
NAM-SL 90X-91X-TM-02-EN-E
With a constant view to adopting the latest technological developments, Automatic Systems reserves the right to amend the above information at any time
.
p. 20/37
10.
Instructions: Receiving the Unit
10.1.
STEP-BY-STEP INSTRUCTIONS AT GLANCE
1.
Inspect the package
2.
Bring the lane on site
3.
Remove the nails
4.
Cut the polystrap bands
5.
Remove the wrapping
6.
Remove the side panel
7.
Unscrew the anchor bolts
8.
Move the unit
10.2.
DETAILED INSTRUCTIONS
1.
Inspect the package
Carefully inspect your crate for exterior damage.
The lane is delivered in a crate. Its base is fixed to a wood pallet via anchor bolts. Foam panels are
placed between the glass obstacles to avoid damage during transport.
Immediately notify your insurance company or your distributor if any damage occurs during transport.