SL 90X-91X
Technical Manual
NAM-SL 90X-91X-TM-02-EN-E
With a constant view to adopting the latest technological developments, Automatic Systems reserves the right to amend the above information at any time
.
p. 21/37
2.
Bring the lane on site
Use an appropriate device to bring the lane on site (fork lift or equivalent).
Transport all units in an upright position.
To avoid damage, do not unpack the SmartLane Security Entrance Lane before
bringing it to the installation location.
3.
Remove the nails
Using a crowbar and a hammer, remove the nails holding the panels of the crate together.
4.
Cut the polystrap bands
Using a sharp knife, cut the polystrap bands around each unit.
5.
Remove the wrapping
Remove the plastic wrapping protecting each unit.
6.
Remove the side panel
Disconnect the ground wire and ground protection cable to remove the unit side panel.
Figure 10 Removing the side panel