p. 21
/46
TLxx-MT-EN-04
• Ensure that the turnstile remains attached to the ground by tightening the expandable dowels. Ensure that the
cables can pass through.
• Make sure that all the housings of the battery are perfectly aligned and horizontal. If needed, add shims between
the housings and the floor to ensure that they are perfectly level.
6.6.3.
i
nStalling
the
StainleSS
Steel
arm
5:1
4:6
5:2
LOCTITE
243
Blue
Fig. 13 - Installing the stainless steel arm
• Put the arm (4:6) in place and push it into the housing until it stops.
• Align the threaded hole in the arm with the hole in the turret.
• Install the fan washer (5:1).
• Apply one drop of Loctite* 243
(blue)
to the screw thread (5:2), and tighten.
6.6.4.
e
lectrical
connectionS
and
initial
poWer
-
up
4:17
4:18
4:19
IN
• The electrical connections must be carried out in accordance with the diagram provided with the equipment.
• Make sure that the power supply cables are not live. All the internal connections have already been made in the
factory.
• Cut off the excess cable length if necessary; connect the 230V single-phase power supply wires to the main switch
terminals (4:18) and the ground wire to the adjacent terminal (4:19).
• Check that the equipment is properly grounded (casing, etc.)
• Make any other connections according to the specifications of the installation (control cables, etc.)
• Check that there are no cables that could break or be damaged by the movement of the mechanism, and that they
all are properly held in the trunking or wire clamps provided for this purpose.
• Turn on the equipment by switching the main switch (4:18) [to the ON position].