26
GDO-11v1 SecuraLift®
Owner Installation Instructions
Battery Back Up Installation
Step 23.1 - Connect the Battery Back Up Kit
Disconnect power to the opener.
Swing open the light diffuser and controls cover.
Remove screws marked “S” above in fi g and lift up
the main cover.
(Fig 49)
.
Feed the SBY-3 charger harness through the
grommet on the metal plate and connect to SBY-3
as shown in wiring diagram.
Mount the brackets RA (item no 9) to battery pack
with item 7 and 8
Secure the battery pack to gdo-11 with 2 screws
item no 5.
Feed the SBY-3 battery harness (item no 3 ) through
the grommet on the metal chassis and connect to
SBY-3 as per diagram.
Mount the pcb support (item no 10) with two screws
( item no 5). Secure the SBY-3 charger board on to
pcb support with 3 screws (item no 6).
Feed charger harness from SBY-3 to the control
board and plug into the 4 pin connector marked
“SBY-3” onto the control board.
WARNING:
After Step 23.1 (i) the opener may
become active (even when power is off). This is a
result of a residual charge in the batteries.
a.
b.
c.
d.
e.
f.
g.
h.
49
fi g
i Connect battery harnesses item 3 and 4
together
(Fig 49).
j Reconnect power.
Step 23.2 - Testing Battery Back Up
Press either the OPERATE button or transmitter
to test the opener.
Whilst door is in motion disconnect mains
power the door should continue to operate as
normal.
NOTE:
Wait for the door to complete its travel.
Press the OPERATE button or transmitter to
activate the door.
Whilst door is in motion re-connect power. The
door should complete the cycle as normal.
Step 23.3 - Troubleshooting
If door stops or moves very slowly under battery
power, the batteries may be weak or have no
charge. Connect mains power and allow the
batteries to charge. This may take 24 - 48 hours to
reach maximum charge capacity.
a.
b.
c.
d.