10
Getting Started
Operation Instructions
5. Once the switches are in the on (I) position
the heating indicator light (#2) and the
cooling indicator light (#3) will turn on. It will
take about 15 – 20 minutes for the hot water
to heat to the appropriate temperature. It will
take about 1 hour for the cold water to cool
to the appropriate temperature.
6. When the water has reached the
appropriate temperatures for hot and
cold the indicator lights will turn off
and the water is ready for use. The
indicator lights will turn back on
automatically when the machine
needs to reheat or cool again.
15-20
min
1 hr
Hot
Cold
7. To replace the bottle vertically, pull out
the empty bottle with two hands. Using
two hands place the new bottle of water
vertically into the bottle supporter (#8).
Summary of Contents for A11-CTTL
Page 1: ...A few simple steps to ensure perfect water every time ...
Page 9: ...6 Getting Started ...
Page 14: ...11 Cleaning ...
Page 20: ...17 Troubleshooting ...
Page 23: ...20 Safety ...