INSTALLATION
Avaya 9135 6000 VA UPS Site Preparation, Installation and Operator’s Manual
S
164201769 Rev 1
22
Connecting the UPS Internal Battery
To ensure proper battery operation:
1.
Verify that the UPS is off and unplugged.
2.
Remove the two screws from the battery switch (see Figure 2).
Two
Screws
Battery Switch
Figure 2. Removing the Battery Switch Screws
3.
Slide the battery connector so that you can read
Connected
(see
Figure 3).
4.
Reinstall the two screws removed in Step 2.
Figure 3. Connecting the Internal Battery Connector