INSTALLATION
Avaya 9135 6000 VA UPS Site Preparation, Installation and Operator’s Manual
S
164201769 Rev 1
24
Installing the Rail Kit
C A U T I O N
S
DO NOT install the UPS or EBM in a hermetically-closed environment without any
exchange of air.
S
The UPS and EBM are heavy (see page 61): 1) Avaya strongly recommends to remove the
battery tray from the UPS before lifting. 2) A minimum of two people are required to lift
the cabinets into the rack.
NOTE
The rails and the necessary mounting hardware are supplied by Avaya.
To install the rail kit:
1.
Adjust the UPS control panel orientation by slightly pulling out the
control panel and rotating it 90
°
counterclockwise (see Figure 4).
Figure 4. Adjusting the UPS Control Panel Orientation