INSTALLATION
Avaya 9135 6000 VA UPS Site Preparation, Installation and Operator’s Manual
S
164201769 Rev 1
33
7.
Carefully position the cabinet upright with the UPS indicators at the
top and place in the pedestals (see Figure 15).
8.
Adjust the pedestals to the size of the UPS and secure the
pedestals with the captive screws.
Figure 15. Tower Position with Two Cabinets