Note:
Allow slack in all cables to avoid tension in the cables as the cable-
management arm moves.
14. Slide the server into the rack until it snaps into place.
15. Insert the optional M6 screws in the front of the server when you move the rack
cabinet or if you install the rack cabinet in a vibration-prone area. See the following
figure.
Turning on the server
After the server is installed in the rack, turn it on to make sure that it works. Once you determine
that it works, turn it off before you start any software installation procedure.
Server rack installation
24 Installing the Avaya S8800 Server for Avaya Aura
™
Communication Manager
June 2010