About the Installation Roadmap and Task Lists
Issue 7 January 2005
37
If using IA770, install
messaging software
on
page 149
- Log in to the S8300 platform
- Stop the system
- Auto-install the messaging software
- Restart the system
- Enable messaging on the S8300 Web
interface
Configure the G700 Media
Gateway
on page 150
- Assign IP addresses to the G700 processors
- Set up IP routing for the stack
- Set up default IP route for the G700
- Check IP connections
- Set up controller list for the G700
- Configure X330 Expansion Module, if
necessary
Install New Firmware on the
G700
on page 160
- Verify contents of the tftp directory
- Determine which firmware to install
- Install firmware on the P330 stack processor
-Set Rapid Spanning Tree
- Install firmware on the G700 media gateway
processor
- Install firmware on the media modules
- Install firmware on other G700s in the stack or
network, if any
Administer Communication
Manager
on page 169
- Reboot the system
- Assign node names, if necessary
- Administer network regions
- Assign LSPs to network regions
- Administer IP interfaces
- Administer the LSP form
- Add media gateway
- Verify changes
- Enable announcements, if necessary
- Save translations
Considerations for IP Phones
Supported by a Local Survivable
Processor
on page 186
Set Up SNMP Alarming on the
G700
on page 188
Complete the Installation of the
S8300 (if the Primary
Controller)
on page 191
- Register the system
- Back up the system
- Check planning documentation
- Connect and administer test endpoints
- Complete electrical installation
- Enable adjunct systems
Checklist 1: Install New G700 with an S8300 (Primary or LSP) (continued)
Major Tasks
Subtasks
2 of 3