Terminal server installation
Issue 7 January 2005
429
Potential failure scenarios and repair actions
If a link goes down between the terminal server and the switch, you must reboot the terminal
server for the link come back up. If you are performing a software upgrade or if a system reset
occurs, you must reboot the terminal server to restore the link. See
To reboot the IOLAN+
on
page 424 for instructions.
Administering IP services
For each adjunct that you connect using TCP/IP, you need to administer IP services to establish
the IP address/TCP port pairing. The IP address is associated with the node name that you just
administered. In this example, we are administering the primary call detail recording (CDR)
connection as end-to-end TCP/IP.
To administer IP services
1. Type change ip-services and press RETURN to assign the CDR endpoint.
change node-names ip
Page 1 of 1
NODE NAMES
Name
IP Address
Name
IP Address
1. switch-clan___
123.456.7
.89
17. ____________
___.___.___.___
2. callacctg_____
123.456.9
.00 18. ____________
___.___.___.___
3. termserver____
123.456.11 .00 19. ____________
___.___.___.___
4. pmslogpc______
123.456.78 .00 20. ____________
___.___.___.___
5. ______________
___.___.___.___
21. ____________
___.___.___.___
6. ______________
___.___.___.___
22. ____________
___.___.___.___
7. ______________
___.___.___.___
23. ____________
___.___.___.___
8. ______________
___.___.___.___
24. ____________
___.___.___.___
9. ______________
___.___.___.___
25. ____________
___.___.___.___
10. ______________
___.___.___.___
26. ____________
___.___.___.___
11. ______________
___.___.___.___
27. ____________
___.___.___.___
12. ______________
___.___.___.___
28. ____________
___.___.___.___
13. ______________
___.___.___.___
29. ____________
___.___.___.___
14. ______________
___.___.___.___
30. ____________
___.___.___.___
15. ______________
___.___.___.___
31. ____________
___.___.___.___
16. ______________
___.___.___.___
32. ____________
___.___.___.___