Issue 2 January 2008
89
Verifying the router has the power for the TIMs and PIMs
The J-series routers have limits on the power they can expend on TIMs and PIMs and still
maintain normal operation. Verify that the project manager, sales representative, or sales
engineer has ordered the appropriate quantity and types of TIM and PIM modules for the router
you are installing.
If the power required of the TIMs and PIMs has not yet been calculated, see "TIM and PIM limits
based on heat and power used by the IG550" in
Overview of the Avaya IG550 Integrated
Gateway
, 03-601548.
Upgrading J-series router software, if necessary
Note:
Note:
The software of the Juniper Services Router must match the firmware version of
the TGM550. See the Communication Manager Software/Firmware Compatibility
Matrix under Downloads on
.
1. See the
Juniper J2320, J2350, J4350, and J6350 Services Router Getting Started Guide,
Release 8.4.
Installing the router in the rack
1. If the customer has a four-post rack and is using a shelf, install the shelf according to
manufacturer guidelines. Set the router on the shelf.
2. If the customer is using the brackets supplied with the router, do the following:
a. Partially screw customer-provided bolts or screws in to a 19-inch (48 centimeters) rack.
Note:
Note:
These bolts or screws are for the resting holes.
b. Temporarily slide the resting holes of the brackets over the resting bolts or screws.
Ensure that a mounting screw position exists for the two top holes and two bottom holes.
Summary of Contents for IG550
Page 1: ...Installing and Configuring the Avaya IG550 Integrated Gateway 03 601554 Issue 2 January 2008 ...
Page 10: ...What procedure you should use 10 Installing and Configuring the IG550 Integrated Gateway ...
Page 176: ...Recovering passwords 176 Installing and Configuring the IG550 Integrated Gateway ...
Page 196: ...196 Installing and Configuring the IG550 Integrated Gateway Index ...