Install Fiber Optic Cable Pass-Thru Kit for MCC1 (Multicarrier) Cabinets
Install the fiber optic cable pass-thru kit (MCC1)
SI Installation and Upgrades
191
June 2004
Figure 21: Dress the cable
Test the Installation
Return to Task List
1
Log into the management terminal.
2
Administer the system by referring to
Administering Fiber Optic Cables
.
3
Type
list configuration all
and press Enter to determine if the new circuit pack appears in the
correct slot and that there are no circuit pack conflicts.
Return to Task List
lcda4fop RPY 021398