Installation Guidelines
10
Determining the Location for the Base Units
Avaya 3910 Wireless Telephone
9
After all of the Avaya 3910 Wireless Telephones are covered on your floor
plan, perform one of the following steps:
— If you have one to three base units, install each base unit at least five
feet apart in the selected location. Be sure to install each base unit as
high as possible so it clears nearby objects (for example, office
cubicles and file cabinets). This grouping of base units is referred to as
a cluster.
— If you have four or more base units:
a
Install three of the base units in the selected
location, with each base unit being five feet
away from another base unit. Be sure to install
each base unit as high as possible so it clears
nearby objects (for example, office cubicles
and file cabinets). This grouping of base units
is referred to as a cluster.
b
Select a location that is at least 30 feet away
from the cluster, and install another cluster of
up to three base units. Within this new cluster,
make sure each base unit is five feet away
from another base unit. Be sure to install each
base unit as high as possible so it clears
nearby objects (for example, office cubicles
and file cabinets).
c
Repeat Step b until all of the base units are
installed.
When you are finished determining the location for the base units, install the
base units and perform a test call from each handset. Be sure to walk to all areas
where the handset will be used so you can determine whether the voice quality is
acceptable.
Summary of Contents for Partner 3910
Page 2: ......