Battery Cabinet Installation
21
Avaya
t
RS9 UPS (9–18 kVA, 9-Slot Models) Site Preparation, Installation and Operator’s Manual
S
164201543 Rev A
Cable Assembly
+
–
Figure 14. Battery Cable Installation
7.
Reinstall the UPS cabinet rear panel using the original screws.
8.
If the battery cable will be installed in flexible or other conduit,
pull the conductors through the conduit. Attach the conduit to
both the UPS power entrance panel and the battery cabinet
entrance panel as shown in Figure 15.
–
+
Figure 15. Battery Cable Installed in Battery Cabinet