Message Networking Help
Home
|
Search
|
Back
|
Fwd
|
Close
Getting Started
Admin
Maintenance
Reference
Home
>
Installation
> Powering up the system
Powering up the system
This topic provides the steps required to power up the Message Networking system. This task assumes that you
have already assembled and correctly connected all required hardware components.
To power up the Message Networking system:
1. Verify that the power cables for the servers and all peripheral devices are connected to the UPS or to an
appropriate AC power outlet. See
S3210R and S3210 back views
or
S3400-H back views
for reference.
Connections include:
"
UPS: connected to an appropriate AC power outlet.
"
Server: connected to the UPS.
"
External modem: if present, connected to the UPS or to an appropriate AC power outlet.
2. Press the On button located on the front of the UPS.
The appropriate lamps should light (see your UPS documentation). Always power up the UPS first.
3. Press the power button on the monitor.
The power lamp on the monitor should light.
4. For an
external
modem is present, press the On button (if present) and verify that the appropriate lamps
light (see the modem documentation for details).
5. For the S3400-H and S3210R, toggle the power switch at the rear of the unit to on (
|
is on,
0
is off).
If needed, see
Identifying the server type and components
to locate the power switch and power button.
The S3400-H server might have one or two power switches, depending on the type of redundant power
supply. Depending on the model, the S3400-H power supply LEDs might be orange until you press the
power button on the front of the unit (normally the LEDs should be green).
6. Press the power button on the front of the unit.
The LEDs on the front of the unit flash once. Then the LEDs light to indicate system power and drive
activity.
7. Wait up to 1 minute for the display to appear on the monitor.
8. If you are installing a new system, continue with
Logging into the system from the console
.
Top of page
46