Pre-upgrade service pack requirements
Issue 2 June 2005
11
At the customer site
Perform the tasks in this section at the customer site.
Task
Steps/Comments
Go to the standard documentation
Use Installation and Upgrades for Avaya G700 Media Gateway and Avaya S8300
Media Server, 555-234-100, Issue 8, April 2005.
To convert the ICC to an LSP, you complete selected tasks from Chapters 3 and 5.
You need to complete only some of the tasks in these chapters. The specific tasks
are identified by page number in the left-hand column. The subtasks to perform or
skip are listed in the right-hand column.
It is important to note where the task is performed. Most of the tasks are done on a
server or gateway — on the ICC/LSP S8300, on the primary controller for the LSP,
on a DHCP server, or on the media gateway processor (MGP). The headings
below indicate on which of these devices the task is performed.
On the new LSP’s primary controller
1. Administer the primary
controller that the LSP
(after conversion) will
use.
Start on page 157 if
the primary controller
is an S8300.
Start on page 163 if
the primary controller
is an S8700 or S8500.
●
Assign node names
●
Administer network regions
●
Associate LSP with a network region
●
Administer the LSP screen
2. Administer the media
gateway.
Starting on page 170.
●
Add media gateway
●
Repeat for each gateway controlled by the
unconverted ICC.
For this scenario, the gateway will not
automatically register with the primary controller
at this point. Skip the subtasks, Verify Changes
and Save Translations in this section.
When the gateway finally registers, the media
modules will automatically populate, unless you
are doing administration without hardware
(AWOH). In this case, you will have to enter the
media module types for each slot.