Issue 2 June 2005
31
On the gateway
5. Telnet to the MGP and
change gateway’s
controller list.
Start on page 487.
●
Clear the gateway’s controller list.
●
Enter the IP addresses of the primary controller
and up to three alternate controllers.
●
Set the LSP transition points.
●
If the media gateway is a G350, enter:
copy running-config startup-config
●
Reset MGP
On the LSP’s primary controller
6. Verify that the media
gateway has registered
with the primary
controller.
●
Open a SAT session and enter
list
media-gateway
. Verify that the Registered field
(Reg?) is set to
y
.
●
Place a test call.
On the ICC/LSP
7. If IA770 is installed, get
IA770 data and stop
IA770.
Page 225.
8. Backup all system files —
translations, OS, and
security backup sets.
Start on page 229.
These backup sets will not be restored on the S8300B.
They should be backed up in case the S8300B is already
in use, and it is necessary to revert to the original
configuration.
9. Record configuration
information
Page 232.
If you have not already done so, in the Record
Configuration Information task, record all of the
configuration information, regardless of the release from
which you are upgrading.
You will re-enter some of this information after the
upgrade.
10. Replace the S8300A with
the S8300B, if necessary.
Page 238.
●
Shut down the S8300A.
●
Remove the S8300A from the gateway. (If the
gateway is a G700, the LED panel must be
removed together with the S8300A.)
●
Insert the S8300B (together with the LED panel for
a G700) into the gateway.
Task
Steps/Comments