Maintenance-Object Repair Procedures
555-233-143
8-368
Issue 1 May 2002
For endpoints of this type, the signaling link is “bound” when the link is
connected at Layer 2 and the link has been associated with an endpoint,
[that is, the endpoint has completed SPID initialization (L3 established)].
■
ASAI adjuncts and BRI endpoints not administered for MIM
initialization (point-to-point):
For endpoints of this type, the signaling link is “bound” when the link is
connected at Layer 2 (L2 established).
For every endpoint type, a signaling link becomes “unbound” when it is
disconnected at Layer 2. For BRI endpoints supporting MIM initialization, a
signaling link may also become “unbound” if a subsequent attempt to perform
SPID initialization on a “bound” link fails (that is, wrong SPID is entered into the
endpoint by the user).
Table 8-155.
Test #626 Signaling Link Status Test
Error
Code
Test
Result
Description / Recommendation
1139
ABORT
The EPN’s packet bus is out-of-service.
1. Follow the repair procedures for the packet bus.
2. After completing step 1, execute the test port long PCSSpp command,
and review the results of the BRI Port Local LAN Loop Around test (#618)
to verify the repair.
1141
ABORT
The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL (Packet Control Circuit Pack) Maintenance
documentation.
2. If step 1 does not resolve the problem, escalate to the next tier.
Continued on next page
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...