BRI-SET, ASAI-ADJ, BRI-DAT
Issue 1 May 2002
8-381
555-233-143
SPID Facility Test
This test is used to verify the wiring and operation of the signaling link between
the switch and a endpoint or adjunct on a BRI interface. This test is not
executed from the administration terminal, but rather is executed by using a
BRI test set equipped with a display. The test set may replace the BRI set,
ASAI or Avaya adjunct under test by plugging it into the same jack or by bridging it
onto the wiring at some point between the switch and the endpoint (or adjunct),
thereby creating a pseudo-BRI multipoint configuration.
When plugged into the port in this manner, the test set establishes a signaling link
connection with the switch and attempts to complete SPID initialization by using
the Service SPID administered for the system (see the System Maintenance
Administration form). If the test set displays the correct administered port address
for the endpoint or adjunct under test, the test passes (see
). If after one minute nothing is displayed on the test set,
the test fails.
SPID Facility Test
Test Result
Description / Recommendation
FAIL
No response is received from the endpoint.
1. Check the physical wiring between the switch and the endpoint or
adjunct.
2. If test continues to fail, escalate to the next tier.
FAIL
Display does not match administered port address for the endpoint or
adjunct.
1. Change station administration for endpoint or adjunct to match
displayed port address.
2. If test continues to fail, escalate the problem.
PASS
Display matches administered port address for the endpoint or adjunct.
For BRI endpoints:
1. Verify that the SPID values administered in the switch and the
endpoint are consistent.
2. If the SPID values are correct, replace the endpoint.
3. If test continues to fail, escalate the problem.
For ASAI adjuncts:
1. Verify that the TEI values administered in the switch and the adjunct
are consistent.
2. If the TEI values are correct, consult the recommended repair
procedures of the manufacturer for the adjunct.
3. If test continues to fail, escalate the problem.
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...