Maintenance-Object Repair Procedures
555-233-143
8-642
Issue 1 May 2002
1039
ABORT
The DS1 Interface circuit pack is providing timing for the system. Executing
this test could cause major system disruption.
If the DS1 Interface circuit pack needs to be tested, set the synchronization
reference to another DS1 Interface circuit pack or to the Tone-Clock circuit via
the following command sequence:
1. Issue the disable synchronization-switch command.
2. Next, issue the set synchronization UUCSS command.
3. Lastly, issue the enable synchronization-switch command.
1950
ABORT
Another loop-back/span test is already executing on the DS1 board or the
board is in a network requested loop-back mode (Line loop back or Payload
loop back). The hardware error log will indicate whether a Customer loop-back
jack test, Far CSU Loopback test, or the One-Way Span test is executing or if
the board is in line loop-back or payload loop-back mode. Only one
long-duration loop-back/span test can be active at a given time. Thus, if a
loop-back/span test is already active, that test must be deactivated via the test
ds1-loop UUCSS end-loopback/span-test command in order to execute this
test.
ABORT
Internal system error
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
Table 8-257.
Test #1212 CPE Loopback Jack Test —
Continued
Error
Code
Test
Result
Description / Recommendation
Continued on next page
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...