Maintenance-Object Repair Procedures
555-233-143
8-686
Issue 1 May 2002
Figure 8-31.
DS1 CONV Complex in Duplicated PNC with 1 SN
DS1 CONV Administration and Board Insertion
Board insertion is the detection of a circuit pack by the system. The DS1 CONV
circuit pack will not be inserted unless the circuit pack type, TN574 or TN1654, is
entered into the associated field in circuit pack administration screen. The Fiber
Endpoint (the EI or the SNI) must also be inserted and be operational for the DS1
CONV circuit pack to function.
Fiber link administration must be completed before the DS1 CONV maintenance
can be operational. Fiber links are administered via the add fiber-link command.
Fiber Endpoints, DS1 CONV circuit pack locations and DS1 facility options are
entered as a part of the fiber link administration.
Metallic
or Fiber
Connection
Fiber Link
E
I
E
I
PPN
. . .
I
N
S
D
S
1
C
O
N
V
. . .
I
S
N
I
S
N
I
S
N
D
S
1
C
O
N
V
E
I
Metallic or Fiber Connection
EPN
DS1 Facilities
DS1 Facilities
SN B-PNC
SN A-PNC
D
S
1
C
O
N
V
E
I
D
S
1
C
O
N
V
Metallic
or Fiber
Connection
Fiber Link
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...