Maintenance-Object Repair Procedures
555-233-143
8-988
Issue 1 May 2002
3
FAIL
Both the primary and secondary are down.
1. Examine the results of the Primary and Secondary Signaling Link
Hardware Tests (#636 and #639) and follow recommendations provided
there.
2. If tests #636 and #639 pass, the Layer 2 Query test may still fail if the
Signaling Channel at the far end has not been administered correctly or if
the Signaling Channel has been busied out. Verify that the Primary and
Secondary Signaling Channel (D channel) at the far end has been
administered correctly. Verify that the DS1 port used for the Primary and
Secondary D-channels has not been busied out at the far end.
PASS
The Primary Signaling Channel is up and, if administered the Secondary
Channel is up.
Table 8-390.
Test #647 Layer 2 Status Query Test —
Continued
Error
Code
Test
Result
Description / Recommendation
Continued on next page
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...