Maintenance-Object Repair Procedures
555-233-143
8-1324
Issue 1 May 2002
PPP Link Status Inquiry Test (#1279)
This nondestructive test determines the state of the PPP link. The test passes
only if the link is up.
Table 8-533.
Test #1279 PPP Link Status Inquiry Test
Error
Code
Test
Result
Description / Recommendation
1124
ABORT
ppp link is not enabled.
1. Verify that the ppp link is enabled (status port UUCSSpp, status link n, or
display data-module).
2. If the link is not enabled, enable the link (change data-module).
3. Repeat the test.
4. Escalate if the problem persists.
1125
ABORT
PPP Link is not in service.
1. Verify whether PPP link is in-service (status port UUCSSpp or status link
n).
2. If the PPP link is not in service, release the link (release link n or release
port UUCSSpp).
3. Repeat the test.
4. Escalate if the problem persists.
2100
ABORT
Could not locate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
2. Escalate if the problem persists.
2500
ABORT
Internal system error.
1. Retry the command at 1-minute intervals up to 3 times.
2. Escalate if the problem persists.
Continued on next page
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...