Maintenance-Object Repair Procedures
555-233-143
8-1456
Issue 1 May 2002
SNI Destructive Facility Test (#757)
This test is destructive.
The SNI runs a destructive loop around of the off-board and on-board loop
around. This test returns the result of the on-board loop around, while test 756
returns the result of the off-board loop around.
Table 8-578.
TEST #757 SNI Destructive Facility Test
Error
Code
Test
Result
Description / Recommendation
1015
ABORT
The system will not allow this test to be run because the SNI circuit pack has
not been busied out. Busyout the SNI circuit pack with busyout board.
Repeat the test board UUCSS long command.
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2300
ABORT
The downlink message necessary to run this test could not be sent.
1. Retry the command at 1-minute intervals up to 3 times.
2301
ABORT
The software timer could not be set before sending the downlink message
necessary to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2304
ABORT
SNI circuit pack responded that it is not able to run the test requested by
software.
1. Retry the command at 1-minute intervals up to 3 times.
Continued on next page
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...