Maintenance Commands
555-233-143
7-184
Issue 1 May 2002
Output
The following example shows the output from the
list measurements clan ppp
command.
Field Descriptions
Date
The date that the data was collected
Time
The current 15-minute interval in which the action was performed
CRC Check
The error count for CRC errors
Total
Total value of the board counter.
NOTE:
The counter value can be up to 7 digits long because the 16- bit
counter on the board. After the occurrence of an “N/A” the delta
equals the total. Busying out or releasing a board or a port, using the
reset board command, and reseating the board all clear the firmware
counters.
Delta
The difference between the current and the previous sample
Invalid Frame
The number of invalid frames detected. Invalid frames are the frames that
are misaligned.
CHAP Failures
The number of failed attempts for ppp authentication
list measurements clan ppp 1C1001 Page 1 of x
Switch Name: sierra Date:02/02/1999
C-LAN PPP PERFORMANCE MEASUREMENT DETAILED REPORT
Date Time CRC Check Invalid Frame CHAP Failures
Total Delta Total Delta Total ‘Delta
02/01 03:08 85 25 185 85 5 0
02/01
02:53
60 60 100 100
5 5
02/01
02:38
N/A N/A N/A N/A
N/A N/A
02/01
02:23
1000060 10 1000090 10
25 5
02/01
02:08
1000050 1000050 1000080 1000080
20 20
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...