Maintenance Commands
555-233-143
7-268
Issue 1 May 2002
resume hardware-group
resume hardware-group
In the course of execution of a
test hardware-group command, it may be
desirable to halt the test temporarily or permanently. This is accomplished by
either the cancel hardware-group command for a background test, or by
pressing
C
ANCEL
for a foreground test.
Resume hardware-group enables you to
restart the hardware group test at the point where it was canceled. This capability
is not available if another hardware group test has been started. The status of a
hardware group test can be obtained with status hardware-group.
When test hardware-group all-ports is canceled, the internally generated port
translations for previously untranslated ports are removed. If resume
hardware-group is then entered, only customer-administered ports will then be
tested. resume does not reinstate the port translations that were removed by
cancellation of the test.
Output
When a test that was executing in the background is resumed, a success
message is displayed. When a test that was executing in the foreground is
resumed, test results are displayed.
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...