Maintenance Commands
555-233-143
7-298
Issue 1 May 2002
BRI,
ASAI
64-126
L3-Established
blank
yes
A demand SPID Facility test is in
progress on the port, and the link is
not currently associated with a BRI
endpoint. See SPID Facility test’s
procedures described in the
BRI-SET section of
‘‘Maintenance-Object Repair
Procedures’’
BRI
64-126
L3-Established
ext#
yes
A demand SPID Facility test is in
progress on the port, and the link is
associated with an endpoint on the
port. See SPID Facility test’s
procedures described in the
BRI-SET section of
‘‘Maintenance-Object Repair
Procedures’’
BRI
0-126
L3-Established
blank
blank
An invalid SPID is assigned to link.
1. Change the SPID value in the
BRI endpoint to match the SPID
administered to the BRI
endpoint on the port. Repeat
status bri-port to determine
whether the Layer 2 state of the
signaling link is
L3-Established
. If it is
not, follow normal escalation
procedures.
Table 7-45.
Interpreting BRI-Port Status Reports —
Continued
Error
Type
Aux
Data
Associated Test
Alarm
Level
On/Off
Board
Test to Clear Value
Continued on next page
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...