Maintenance-Object Repair Procedures
555-233-143
8-36
Issue 1 May 2002
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below. For example,
by clearing error codes associated with the Looparound test (#161), you may also
clear errors generated from other tests in the testing sequence.
NO-OP Tests
The maintenance strategy for EMBEDDED AUDIX emulates the one for
ANL-16-L. The tests listed below apply only to ANL-16-L and not to EMBEDDED
AUDIX. These tests always return PASS.
■
Battery Feed test (#35)
■
Audits and Updates test (#36)
■
Station Present test (#48)
Tests 36 and 48 ABORT when AUDIX is not running.
NPE Crosstalk Test (#6)
This test verifies that this port’s NPE channel talks on the selected time slot and
never crosses over to time slots reserved for other connections. If the NPE is not
working correctly, one-way and noisy connections may be observed. This test is
part of the long test sequence and executes in about 25 seconds.
Order of Investigation
Short Test
Sequence
Long Test
Sequence
D/ND
1
1.
D = Destructive; ND = Nondestructive
Looparound test (#161)
X
ND
Conference test (#7)
X
ND
NPE Crosstalk test (#6)
X
ND
Table 8-13.
Test #6 NPE Crosstalk Test
Error
Code
Test
Result
Description / Recommendation
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
Continued on next page
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...