Maintenance-Object Repair Procedures
555-233-143
8-634
Issue 1 May 2002
When the ELB test is initiated, maintenance software sends an appropriate
message to the TN767E DS1 Interface circuit pack to start the test. The board
sets up the ELB loop back, transmit a test pattern, and verify that the pattern is
received unaltered through the loop back. If the transmitted and received pattern
is different, the test fails.
In addition, the DS1 circuit pack hardware applies a DC current while the test is
running in order to detect any broken wires that may not be detected by the
loop-back pattern.
When the test is complete, all trunks or ports on the TN767E DS1 Interface circuit
pack are restored to the in-service state after the release board command is
entered.
Table 8-255.
Test #1210 CSU Equipment Loop-Back Test
Error
Code
Test
Result
Description / Recommendation
ABORT
Internal system error
1. Retry test ds1-loop UUCSS ds1/csu-loopback-tests at 1-minute
intervals up to 5 times.
1005
ABORT
CSU Equipment Loopback test cannot be executed in the current configuration.
To run this test, the
Near-End CSU Type
field on the DS1 circuit pack
administration form must be set to integrated and the
Bit Rate
field must be
set to “1.544” (for 24-channel operation).
1. Use the change ds1 UUCSS command to set the
Near-End CSU Type
field on the DS1 circuit pack administration form to integrated, and/or
change the
Bit Rate
field to “1.544” if the board is to be used in a
24-channel configuration.
2. Retry test ds1-loop UUCSS ds1/csu-loopback-tests.
1015
ABORT
Ports on the DS1 Interface circuit pack have not been busied out to
out-of-service.
1. Enter the busyout board UUCSS command to put all trunks or ports of the
DS1 Interface circuit pack into the out-of-service state.
2. Retry the command.
1039
ABORT
The DS1 Interface circuit pack is providing timing for the system. Executing
this test could cause major system disruption.
If the DS1 Interface circuit pack needs to be tested, set the synchronization
reference to another DS1 Interface circuit pack or to the Tone-Clock circuit via
the following command sequence:
1. Issue the disable synchronization-switch command.
2. Next, issue the set synchronization UUCSS command.
3. Lastly, issue the enable synchronization-switch command.
Continued on next page
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...