PE-BCHL (PRI Endpoint Port)
Issue 1 May 2002
8-1225
555-233-143
Audit and Update Test (#36)
This test sends port level translation data from switch processor to the UDS1
interface circuit pack to assure that the port’s translation is correct. The port audit
operation verifies the consistency of the current state of port kept in the UDS1
interface circuit pack and in the switch software.
Table 8-500.
Test #36 Audit and Update Test
Error
Code
Test
Result
Description / Recommendation
ABORT
Internal system error
2000
ABORT
Response to the test was not received within the allowable time period.
2100
ABORT
Could not allocate the necessary system resources to run this test.
FAIL
Test failed due to internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
PASS
Port translation has been updated successfully. The current port states kept in
the UDS1 interface circuit pack and switch software are consistent. If the port
is busied out, the test will not run, but will return PASS. To verify that the port is
in-service:
1. Enter status pri-endpoint extension to verify that the port is in-service. If
the port is in-service, no further action is necessary. If the port is
out-of-service, continue to Step 2.
2. Enter release pri-endpoint extension or release port UUCSSpp
command to put port back into in-service.
3. Retry the test command.
Continued on next page
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...