Maintenance Commands
555-233-143
7-446
Issue 1 May 2002
test link
test link link# [short | long] [repeat# | clear] [schedule]
This command verifies that the specified link is administered and performs a
series of tests on the link.
Parameters
Output
The following display shows a typical result when
test link 1 long is entered for
an S8700 IP Connect system.
Field Descriptions
Port
Each link is identified by a number (1-16) assigned on the Communication-Interface
Links form. Display communication-interface links shows the location and
identification of each link.
Port
The location of the port on an Ethernet circuit pack associated with the link being tested.
test link 1 long
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
08A0617 ETH-PT 1278 ABORT 1000
08A0617 ETH-PT 1281 PASS
08A0617 ETH-PT 1286 PASS
08A0617 ETH-PT 1282 PASS
Command successfully completed
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...