INSTALLATION
Avaya
t
S9RM UPS Site Preparation, Installation and Operator’s Manual
S
05147387 Rev C
23
4.
Carefully position the cabinet upright with the air vents at the top
(see Figure 8).
5.
Continue to “Installing the UPS” on page 25 to complete the
installation.
Air Vents
Figure 8. UPS with Pedestals
6.
Carefully position the cabinets upright with the air vents at the top
(see Figure 9).
Air Vents
Figure 9. Tower UPS with EBMs