UPS MAINTENANCE
Avaya
t
S9RM UPS Site Preparation, Installation and Operator’s Manual
S
05147387 Rev C
54
Testing New Batteries
NOTE
The batteries must be fully charged and the UPS must not be in Battery mode to
perform the self-test.
NOTE
Load must be applied to the UPS to perform the battery test. Apply the following
load amounts according to the UPS rating: 50% load for 700 VA; 35% load for 1000 VA; 38%
load for 1500 VA; or 25% load for 2000 VA.
Press and hold the
button for three seconds to initiate a self-test.
After the test is complete, the
indicator should turn off (it may take a
few seconds to turn off). If the
indicator continues to flash, check
the battery connections. Call your Avaya service representative if the
problem persists.
Recycling the Used Battery or UPS
Contact your local recycling or hazardous waste center for information
on proper disposal of the used battery or UPS.
W A R N I N G
S
Do not dispose of the battery or batteries in a fire. Batteries may explode. Proper
disposal of batteries is required. Refer to your local codes for disposal requirements.
S
Do not open or mutilate the battery or batteries. Released electrolyte is harmful to the
skin and eyes. It may be toxic.
C A U T I O N
Do not discard the UPS or the UPS batteries in the trash. This product contains sealed,
lead-acid batteries and must be disposed of properly. For more information, contact your
local recycling/reuse or hazardous waste center.
C A U T I O N
Do not discard waste electrical or electronic equipment (WEEE) in the trash. For proper
disposal, contact your local recycling/reuse or hazardous waste center.