Use the following table as a checklist when you verify the contents of the shipping container. For
more information about ordering replacement parts, see
Table 7: VSP 9010 AC chassis shipping accessories
Check
Accessory
Usage
VSP 9010 AC chassis
Eight I/O and CP filler modules
You must install filler modules in
unused slots.
Four SF filler modules
You must install filler modules in
unused slots.
Six power supply filler panels
You must install filler panels in
unused bays. Power supply bays
1 and 5 ship unpopulated.
Eight power cord retainers
Use to prevent the accidental
removal of power cords.
Two cooling modules
One DB9 to DB9 connector
One chassis cover panel kit
The cover panel kit includes the
cable management cover with two
mounting brackets and screws,
and the air inlet cover with
mounting bracket.
Screws and hardware:
The hardware required to mount
the chassis in a rack depends on
your rack type.
Phillips-head screws
Clip nuts
Mount the chassis to a rack rail.
Use the clip nuts, if necessary.
Phillips-head screws
Hex nuts
Mount the installation shelf to a
rack rail.
If the rack does not use threaded
rail holes, you must use the
supplied clip nuts with the clip nut
screws.
Installation shelf
Mount the chassis in an
equipment rack.
Grounding kit hardware
Connect the chassis to the ground
of the rack.
The following figure illustrates the accessories in the chassis shipping container.
Virtual Services Platform 9010 chassis
October 2015
Installing the Avaya VSP 9000
26