Figure 8: ESD ground strap input (rear)
Successful installation verification
In a normal power-up sequence, the LEDs light as follows:
• After you apply power to the switch, the corresponding power supply power LEDs and cooling
module LED lights amber.
• After the CP module starts to boot, the Online LED for each I/O module lights amber.
• Each I/O module initiates a self-test, during which the port and module LEDs display various
patterns to indicate the progress of the self-test.
• Upon successful completion of the self-test, within 5 to 15 minutes after you apply power,
depending on the module type, the I/O module Online LED transitions from amber to green.
If the LEDs on the modules light in this sequence, your installation is successful. Contact your
network administrator to verify that the Avaya Virtual Services Platform 9000 connects to the
network.
If the LEDs do not light in this sequence, contact your local Avaya Technical Solutions Center.
Virtual Services Platform 9010 chassis
October 2015
Installing the Avaya VSP 9000
46